01 / THE FILM
SYNOPSIS.
The main task on this Key Largo visit is to document Moulin à Vent’s dimensions. The opening explains that the family has not obtained the original plans, so detailed measurements are needed to draw the vessel in her current condition and support the engineering and naval-architecture assessments discussed in the film. Before that work begins, the deck needs a thorough clean after time away.
The visit also brings a local contractor aboard for a project discussion and connects the measurements with a scale-model project in France. Alongside those practical tasks, baby Abe makes his first trip to the boat, while the children’s time in the water includes an unwelcome encounter with a territorial triggerfish. Published in February 2026, the film captures an assessment and planning visit; the discussions and proposed next steps belong to that point in the restoration story.
This film records an earlier stage of the project. Plans, arrangements and fundraising references reflect the time of filming.
02 / PUBLISHED CHAPTERS
FIND A MOMENT.
Chapter links open this film on YouTube at the stated time.
- This Trip Goals ↗
- Intro to MAV ↗
- Sea gypsies ↗
- Abe’s First Trip to the Boat ↗
- Arriving in Key Largo at Night ↗
- Cleaning Years of Bird Mess Off the Deck ↗
- Taking Detailed Measurements of the MAV ↗
- A Scale Model of the Boat Being Built in France ↗
- Noah vs. the Triggerfish ↗
- Meeting with the Contractor ↗
- Wrap up ↗
03 / ENGLISH CAPTION EXCERPTS
EDITED TRANSCRIPT.
Selected passages from the film's English captions. This shortened transcript omits intervening speech and incidental exchanges.
READ THE EDITED TRANSCRIPT
- 0:00
So this trip we're going to head down and we're going to do some assessments on the vessel. We're going to take really detailed measurements because we don't have, the original plans for the boat.
- 4:42
Next up, we moved on to our main project for the weekend, taking detailed measurements inside, outside and beneath the vessel. We have not been able to obtain any original plans for the ship, so Kyle has been working on drawing it up in its current state. Moving forward, these measurements will be key to the needed naval engineer and architect evaluations
- 5:34
But with our assistance, they are working diligently to build an even more precise model of her.
- 6:57
Our last order of business was to meet with a local contractor. Kyle went to retrieve Andy from USA Yacht Tech and Key Largo Boatyard and Storage, who joined us aboard for a rundown of the project.
04 / CONTEXT + SOURCES
FOLLOW THE RECORD.
The measurements in this film document the vessel as found. The historical documents archive provides a separate trail of surviving technical papers and contemporary reporting.
EXPLORE THE HISTORICAL DOCUMENTS →VESSEL IDENTIFICATION / THE REDISCOVERY RECORD →
Synopsis and chapter labels follow the published film description. Transcript excerpts come from the film's English caption panel. The publication date is the YouTube release date; the filming date has not been established separately.
